Laboratoire Poly-DDMRP

Contactez-nous

Téléphone
(514) 340-4711 p.4919

Télécopieur
(514) 340-4086

Pavillon
Principal

Recherche

Étudiants

  • Guillaume DESSEVRE (doctorat), codirigé P. Baptiste, J. Lamothe et R. Pellerin.
  • Guillaume MARTIN (doctorat), codirigé par M. Lauras et P. Baptiste.
  • Wajdi TOUNSI (maîtrise recherche), codirigé par P. Baptiste et R. Pellerin.

Publications

  • AZZAMOURI, A., BAPTISTE, P., PELLERIN, R., and DESSEVRE, G. (2022), ‘Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method’, International Journal of Production Research, pp. 1-12, https://doi.org/10.1080/00207543.2022.2109219.

  • DESSEVRE, G., LAMOTHE, J., PELLERIN, R., BEN ALI, M., BAPTISTE, P., and POMPONNE, V. (2022), ‘Comparison of pull management policies for a divergent process with DDMRP buffers: an industrial case study’, to appear in International Journal of Production Research (accepted in December 2022), https://doi.org/10.1080/00207543.2022.2162997.

  • DESSEVRE, G., BAPTISTE, P., LAMOTHE, J., and PELLERIN, R. (2021), ‘Visual Charts Produced by Simulation to Correlate Service Rate, Resource Utilization and DDMRP Parameters’, to appear in International Journal of Production Research (accepted in December 2021).

  • AZZAMOURI, A., DESSEVRE, G., BAPTISTE, P. , and PELLERIN, R.(2021), ‘Demand Driven Material Requirements Planning (DDMRP): A Systematic Review and Classification’, Journal of Industrial Engineering and Management, 14 (3), pp. 73-89, Online ISSN: 2013-0953 – Print ISSN: 2013-8423 https://doi.org/10.3926/jiem.3331.

  • DESSEVRE, G., LAMOTHE, J., POMPONNE, V., LAURAS, M., BAPTISTE, P. , and PELLERIN, R. (2020), ‘A DDMRP implementation user feedbacks and stakes analysis’, ILS 2020, Austin (Texas), USA, April 22-24.

  • DESSEVRE, G., MARTIN, G., BAPTISTE, P. ,LAMOTHE, J., PELLERIN, R., and LAURAS, M. (2019), ‘Decoupled Lead Time in finite capacity flowshop: a feedback loop approach’, IESM 2019, September 25-27, Shanghai, China.

  • BAPTISTE, P. et PELLERIN, R. (2018), "Planification à court terme dans un système de production complexe géré en DDMRP’, MOSIM 2018, 27-29 juin, Toulouse, France.