Echternach--Jaubert, M., Pellerin, R., & Gamache, M. (2025). A Digital Transformation Project Portfolio Management Model for Underground Mines. Procedia Computer Science, 256, 1467-1473.
Répertoire des expertises
Gamache, Michel

Répertoire des expertises
Gamache, Michel
Répertoire des expertises
Publications par date
Article de revue (49)
Communication de conférence (10)
Livre
Chapitre de livre (3)
Brevet
Rapport (41)
Thèse (1)
Ensemble de données
Ressource pédagogique
Image
Enregistrement audio
Enregistrement vidéo
Autre
Michel Gamache (104)
- 2025 (2)
Article de revue Article de revue Hajlaoui, Y., Labib, R., Plante, J.-F., & Gamache, M. (2025). Backpropagation-based inference for spatial interpolation to estimate the blastability index in an open pit mine. Computers and Geosciences, 194, 15 pages.
- 2024 (7)
Rapport Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2024). A digital transformation project portfolio management model for underground mines. (Rapport technique n° G-2024-75).Rapport Maftah, M., Gamache, M., Agard, B., & Gendreau, M. (2024). Coordination of electrical drilling machines in open-pit mines : a constraint programming approach. (Rapport technique n° G-2024-62).Article de revue Robatto Simard, S., Gamache, M., & Doyon-Poulin, P. (2024). Development and usability evaluation of VulcanH, a CMMS prototype for preventive and predictive maintenance of mobile mining equipment. Mining, 4(2), 326-351.Rapport Maftah, M., Agard, B., Gendreau, M., & Gamache, M. (2024). Integrated dispatching and coordination of electrical drill rigs in open-pit mines: A constraint programming approach. (Rapport technique n° G-2024-74).Article de revue Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2024). Opportunities for research to achieve the vision of the Smart Mine. CIM Journal, 2377527 (34 pages).Rapport Maftah, M., Gendreau, M., Agard, B., & Gamache, M. (2024). Scheduling of drilling machines in open-pit mines: Stochastic and non-probabilistic CP approaches. (Rapport technique n° G-2024-71).Article de revue Aalian, Y., Gamache, M., & Pesant, G. (2024). Short-term underground mine planning with uncertain activity durations using constraint programming. Journal of Scheduling, 17 pages.
- 2023 (6)
Article de revue Robatto Simard, S., Gamache, M., & Doyon-Poulin, P. (2023). Current Practices for Preventive Maintenance and Expectations for Predictive Maintenance in East-Canadian Mines. Mining, 3(1), 26-53.Article de revue Zagré, G. E., Gamache, M., Labib, R., & Shlenchak, V. (2023). Machine learning algorithms for real-time coal recognition using monitor-while-drilling data. International Journal of Mining, Reclamation and Environment, 26 pages.Article de revue Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2023). Optimising the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty. International Journal of Mining, Reclamation and Environment, 37(5), 355-374.Communication de conférence Aalian, Y., Pesant, G., & Gamache, M. (août 2023). Optimization of Short-Term Underground Mine Planning Using Constraint Programming [Communication écrite]. 29th International Conference on Principles and Practice of Constraint Programming (CP 2023), Toronto, ON, Canada (16 pages).Article de revue Gamache, M., Basilico, G., Frayret, J.-M., & Riopel, D. (2023). Real-time multi-agent fleet management strategy for autonomous underground mines vehicles. International Journal of Mining, Reclamation and Environment, 37(9), 649-666.Article de revue Grogan, S., Gamache, M., & Pellerin, R. (2023). Using historical data to dynamically route post-disaster assessment unmanned aerial vehicles in the context of responding to tornadoes. Applied Sciences, 13(7), 4178.
- 2022 (6)
Article de revue Campeau, L.-P., Gamache, M., & Martinelli, R. (2022). Integrated optimisation of short- and medium-term planning in underground mines. International Journal of Mining Reclamation and Environment, 36(4), 235-253.Article de revue Grogan, S., Perrier, N., Gamache, M., & Pellerin, R. (2022). Location of disaster assessment UAVs using historical tornado data. Geomatics, Natural Hazards and Risk, 13(1), 2385-2404.Communication de conférence Robatto Simard, S., Bouchard, A., Tang, C., Tahan, A., Doyon-Poulin, P., & Gamache, M. (novembre 2022). Outil d'aide à la décision en planification de maintenance [Decision support tool for maintenance planning]. [Résumé]. 43e édition Québec Mines + Énergie, Montréal, Québec, Canada.Article de revue Rimélé, A., Gamache, M., Gendreau, M., Grangier, P., & Rousseau, L.-M. (2022). Robotic mobile fulfillment systems: a mathematical modelling framework for e-commerce applications. International Journal of Production Research, 60(11), 3589-3605.Article de revue Campeau, L.-P., & Gamache, M. (2022). Short- and medium-term optimization of underground mine planning using constraint programming. Constraints, 27(4), 414-431.Rapport Aalian, Y., Gamache, M., & Pesant, G. (2022). Short-term underground mine planning with uncertain activity durations using constraint programming. (Rapport technique n° G-2022-44).
- 2021 (6)
Rapport Rimelé, A., Grangier, P., Gamache, M., Gendreau, M., & Rousseau, L.-M. (2021). E-commerce warehousing : learning a storage policy. (Rapport technique n° CIRRELT-2021-03).Article de revue Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Learning high-order spatial statistics at multiple scales: A kernel-based stochastic simulation algorithm and its implementation. Computers & Geosciences, 149, 11 pages.Rapport Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2021). Optimizing the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty. (Rapport technique n° G-2021-17).Rapport Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Training image free high-order stochastic simulation based on aggregated kernel statistics. (Rapport technique n° G-2021-14).Article de revue Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Training Image Free High-Order Stochastic Simulation Based on Aggregated Kernel Statistics. Mathematical Geosciences, 53(7), 1469-1489.Article de revue Grogan, S., Pellerin, R., & Gamache, M. (2021). Using tornado-related weather data to route unmanned aerial vehicles to locate damage and victims. OR Spectrum, 43(4), 905-939.
- 2020 (6)
Article de revue Rimélé, A., Dimitrakopoulos, R., & Gamache, M. (2020). A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resources Policy, 65, 8 pages.Chapitre de livre Gamache, M., & Auger, G. (2020). Analysis of maximum flow algorithms for ultimate pit contour problems. Dans Xie, H. (édit.), Computer Applications in the Mineral Industries (p. 267-272).Rapport Bigeon, E., Gagnon, M., Alarie, S., Tahan, A., & Gamache, M. (2020). Long-term influence of priority order of short-term unit commitment in a complex hydroelectric system. (Rapport technique n° G-2020-26).Rapport Rimelé, A., Gamache, M., Gendreau, M., Grangier, P., & Rousseau, L.-M. (2020). Robotic mobile fulfillment systems : a mathematical modelling framework for e-commerce applications. (Rapport technique n° CIRRELT 2020-42).Article de revue Campeau, L.-P., & Gamache, M. (2020). Short-term planning optimization model for underground mines. Computers & Operations Research, 115, 104642 (12 pages).Article de revue Martinelli, R., Collard, J., & Gamache, M. (2020). Strategic planning of an underground mine with variable cut-off grades. Optimization and Engineering, 21(3), 803-849.
- 2019 (5)
Article de revue Montagné, R., Gamache, M., & Gendreau, M. (2019). A shortest path-based algorithm for the inventory routing problem of waste vegetable oil collection. Journal of the Operational Research Society, 70(6), 986-997.Communication de conférence Grogan, S., Gamache, M., & Pellerin, R. (juin 2019). Dynamically Routing UAVs in the Aftermath of a Severe Tornado [Communication écrite]. PROLOG 2019, Metz, France.Article de revue Yao, L., Dimitrakopoulos, R., & Gamache, M. (2019). High-Order Sequential Simulation via Statistical Learning in Reproducing Kernel Hilbert Space. Mathematical Geosciences, 52(5), 693-723.Article de revue Zagre, G. É. P., Marcotte, D., Gamache, M., & Guibault, F. (2019). New Tabu Algorithm for Positioning Mining Drillholes with Blocks Uncertainty. Natural Resources Research, 28(3), 609-629.Rapport Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2019). Solving the mixed-integer linear programming problem for mine production scheduling with stockpiling under multi-element geological uncertainty. (Rapport technique n° G-2019-05).
- 2018 (9)
Rapport Rimélé, A., Dimitrakopoulos, R., & Gamache, M. (2018). A dynamic stochastic approach for open-pit mine planning. (Rapport technique n° G-2018-87).Article de revue Yao, L., Dimitrakopoulos, R., & Gamache, M. (2018). A new computational model of high-order stochastic simulation based on spatial Legendre moments. Mathematical Geosciences, 50(8), 929-960.Rapport Yao, L., Dimitrakopoulos, R., & Gamache, M. (2018). A new computational model of high-order stochastic simulation based on spatial Legendre moments. (Rapport technique n° G-2018-89).Article de revue Adrien Rimélé, M., Dimitrakopoulos, R., & Gamache, M. (2018). A stochastic optimization method with in-pit waste and tailings disposal for open pit life-of-mine production planning. Resources, 57, 112-121.Article de revue Bai, X., Marcotte, D., Gamache, M., Gregory, D., & Lapworth, A. (2018). Automatic generation of feasible mining pushbacks for open pit strategic planning. Journal of the Southern African Institute of Mining and Metallurgy, 118(5), 515-530.Rapport Campeau, L.-P., Gamache, M., & Martinelli, R. (2018). Integreted optimization of short- and medium-term planning in underground mine. (Rapport technique n° G-2018-55).Rapport Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2018). Multi-product mine scheduling optimization under multi-element geological uncertainty. (Rapport technique n° G-2018-72).Rapport Campeau, L.-P., & Gamache, M. (2018). Short- and medium-term optimization of underground mine planning using constraints programming. (Rapport technique n° G-2018-94).Communication de conférence Grogan, S., Gamache, M., & Pellerin, R. (juin 2018). The use of unmanned aerial vehicles and drones in search and rescue operations - a survey [Communication écrite]. PROLOG 2018, Hull, UK.
- 2017 (4)
Rapport Rimélé, A., Gamache, M., & Dimitrakopoulos, R. (2017). Heuristic method for the stochastic open pit mine production scheduling problem. (Rapport technique n° G-2017-34).Communication de conférence Saoudi, M., Riopel, D., & Gamache, M. (mai 2017). Les indicateurs de performance des systèmes de préparation de commande : revue de littérature [Communication écrite]. 12e congrès international de génie industriel (CIGI 2017), Compiègne, France (9 pages).Rapport Rimélé, A., Gamache, M., & Dimitrakopoulos, R. (2017). Open pit stochastic optimization with in-pit tailings storage. (Rapport technique n° G-2017-35).Rapport Azeuli Nkamegni, K., Gamache, M., Hertz, A., & Paroz, S. (2017). Optimizing keyword positions for search engine marketing. (Rapport technique n° G-2017-26).
- 2016 (5)
Article de revue Homaie-Shandizi, A.-H., Partovi Nia, V., Gamache, M., & Agard, B. (2016). Flight deck crew reserve: From data to forecasting. Engineering Applications of Artificial Intelligence, 50, 106-114.Article de revue Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2016). Location arc routing problem with inventory constraints. Computers and Operations Research, 76, 84-94.Rapport Campeau, L.-P., & Gamache, M. (2016). Short-term planning optimization model for underground mines. (Rapport technique n° G-2016-26).Article de revue Nelis, G., Gamache, M., Marcotte, D., & Bai, X. (2016). Stope optimization with vertical convexity constraints. Optimization and Engineering, 17(4), 813-832.Article de revue Carpentier, S., Gamache, M., & Dimitrakopoulos, R. (2016). Underground long-term mine production scheduling with integrated geological risk management. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 125(2), 93-102.
- 2015 (6)
Rapport Piveteau, A., Gamache, M., & Pellerin, R. (2015). An iterative algorithm based on evolutive cuts for project scheduling with material storage constraints. (Rapport technique n° G-2015-106).Rapport Gamache, M. (2015). A structured approach to model logical constraints. (Rapport technique n° G-2015-48).Rapport Homaie-Shandizi, A.-H., Partovi Nia, V., Gamache, M., & Agard, B. (2015). Flight deck crew absenteeism: From data to forecasting. (Rapport technique n° G-2015-108).Communication de conférence David, A., Gamache, M., & Riopel, D. (octobre 2015). Localisation optimale de produits au centre de distribution de Thomas & Betts de Bromont, Canada [Communication écrite]. 11e Congrès international de génie industriel, Québec, Canada (7 pages).Rapport Nelis, G., Gamache, M., Marcotte, D., & Bai, X. (2015). Stope optimization with convexity constraints. (Rapport technique n° G-2015-47).Rapport Carpentier, S., Gamache, M., & Dimitrakopoulos, R. (2015). Underground long-term mine production scheduling with integrated geological risk management. (Rapport technique n° G-2015-107).
- 2014 (4)
Article de revue Riquelme Rodriguez, J. P., Langevin, A., & Gamache, M. (2014). Adaptive large neighborhood search for the periodic capacitated arc routing problem with inventory constraints. Networks, 64(2), 125-139.Rapport Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2014). Adaptive large neighborhood search for the periodic capacitated arc routing problem with inventory constraints. (Rapport technique n° G-2014-01).Rapport Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2014). Location of water depots in open-pit mine networks. (Rapport technique n° G-2014-12).Article de revue Riquelme-Rodríguez, J.-P., Gamache, M., & Langevin, A. (2014). Periodic capacitated arc-routing problem with inventory constraints. Journal of the Operational Research Society, 65(12), 1840-1852.
- 2013 (2)
Communication de conférence Damala, Y., Lacerte, K., Gamache, M., & Riopel, D. (juin 2013). Impacts de nouveaux processus sur les opérations d'Air Canada Cargo [Communication écrite]. 10e congrès international de génie industriel, La Rochelle, France (8 pages).Rapport Collard, J., Martinelli, R., & Gamache, M. (2013). Strategic Planning of an Underground Mine with Variable Cut-off Grades. (Rapport technique n° G-2013-86).
- 2012 (6)
Article de revue Jaoua, A., Riopel, D., & Gamache, M. (2012). A simulation framework for real-time fleet management in internal transport systems. Simulation Modelling Practice and Theory, 21(1), 78-90.Article de revue Dupuis, C., Gamache, M., & Page, J.-F. (2012). Logical Analysis of Data for Estimating Passenger Show Rates at Air Canada. Journal of Air Transport Management, 18(1), 78-81.Communication de conférence Damala, Y., Gamache, M., Riopel, D., & Lecerte, K. (mai 2012). Modélisation de la logistique d'un entrepôt pour Air Canada Cargo [Communication écrite]. 2e Journées de l'Optimisation, Montréal, Québec.Article de revue Laroche, M.-A., Gamache, M., & Olivier-Ouellet, J. (2012). Optimization of Codeshares Flight Selection for an Airline Company. INFOR, 50(1), 31-39.Rapport Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2012). Periodic Capacitated Arc Routing Problem with Inventory Constraints. (Rapport technique n° G-2012-73).Article de revue Jaoua, A., Riopel, D., & Gamache, M. (2012). Specification of an intelligent simulation based real time control architecture : application to truck control system. Computers in Industry, 63(9), 882-894.
- 2010 (1)
Communication de conférence Jaoua, A., Riopel, D., & Gamache, M. (mai 2010). Adaptation de la commande prédictive aux systèmes à événements discrets : application pour l'optimisation en temps réel du processus de transport minier [Communication écrite]. 8e Conférence Internationale de MOdélisation et SIMulation (MOSIM 2010), Hammamet, Tunisie (9 pages).
- 2009 (6)
Rapport Jaoua, A., Riopel, D., & Gamache, M. (2009). Adaptation de la commande prédictive aux systèmes à événements discrets: application pour l'optimisation en temps réel du processus de transport minier. (Rapport technique n° G-2009-82).Article de revue Jaoua, A., Riopel, D., & Gamache, M. (2009). A framework for realistic microscopic modelling of surface mining transportation systems. International Journal of Mining, Reclamation and Environment, 23(1), 51-75.Rapport Gamache, M., Hébert-Desgroseilliers, L., & Desaulniers, G. (2009). A Generic Linear Program for an Optimal Mine Production Plan. (Rapport technique n° G-2009-83).Communication de conférence Gamache, M., Hébert-Desgroseilliers, L., & Desaulniers, G. (novembre 2009). A generic linear program for an optimal mine production plan [Communication écrite]. Mine Planning and Equipment Select & Environmental Issues and Waste Management in Energy and Mineral Product, Banff, Canada.Rapport Jaoua, A., Riopel, D., & Gamache, M. (2009). Efficient simulation model for real-time fleet management problems in international transport systems. (Rapport technique n° G-2009-33).Rapport Jaoua, A., Riopel, D., & Gamache, M. (2009). Specification of an intelligent simulation based real time control architecture : Application to truck control system. (Rapport technique n° G-2009-32).
- 2008 (2)
Article de revue Bigras, L. P., Gamache, M., & Savard, G. (2008). The Time-Dependent Traveling Salesman Problem and Single Machine Scheduling Problems With Sequence Dependent Setup Times. Discrete Optimization, 5(4), 685-699.Article de revue Bigras, L. P., Gamache, M., & Savard, G. (2008). Time-Indexed Formulations and the Total Weighted Tardiness Problem. INFORMS Journal on Computing, 20(1), 133-142.
- 2007 (3)
Article de revue Gamache, M., Hertz, A., & Ouellet, J. O. (2007). A Graph Coloring Model for a Feasibility Problem in Monthly Crew Scheduling With Preferential Bidding. Computers & Operations Research, 34(8), 2384-2395.Article de revue Achour, H., Gamache, M., Soumis, F., & Desaulniers, G. (2007). An Exact Solution Approach for the Preferential Bidding System Problem in the Airline Industry. Transportation Science, 41(3), 354-365.Rapport Jaoua, A., Gamache, M., & Riopel, D. (2007). Comparaison d'approches de modélisation de problèmes tests pour le pilotage du transport : application aux mines à ciel ouvert. (Rapport technique n° G-2007-102).
- 2006 (2)
Article de revue Beaulieu, M., & Gamache, M. (2006). An enumeration algorithm for solving the fleet management problem in underground mines. Computers & Operations Research, 33(6), 1606-1624.Rapport Bigras, L.-P., Gamache, M., & Savard, G. (2006). The Time-Dependent Traveling Salesman Problem and Single Machine Scheduling Problems with Sequence Dependent Setup Time. (Rapport technique n° G-2006-15).
- 2005 (4)
Rapport Gamache, M., Hertz, A., & Ouellet, J. O. (2005). A Graph Coloring Model for a Feasibility Problem in Crew Scheduling. (Rapport technique n° G-2005-34).Article de revue Gamache, M., Grimard, R., & Cohen, P. (2005). A shortest-path algorithm for solving the fleet management problem in underground mines. European Journal of Operational Research, 166(2), 497-506.Article de revue Bigras, L.-P., & Gamache, M. (2005). Considering Displacement Modes in the Fleet Management Problem. International Journal of Production Research, 43(6), 1171-1184.Rapport Bigras, L.-P., Gamache, M., & Savard, G. (2005). Time-Indexed Formulations and the Total Weighted Tardiness Problem. (Rapport technique n° G-2005-30).
- 2004 (3)
Rapport Beaulieu, M., & Gamache, M. (2004). An Enumeration Algorithm for Solving the Fleet Management Problem in Underground Mines. (Rapport technique n° G-2004-52).Rapport Achour, H., Gamache, M., Soumis, F., & Desaulniers, G. (2004). An Exact Solution Approach for the PBS Problem. (Rapport technique n° G-2004-89).Article de revue Gamache, M., Cohen, P., Grimard, R., & Bigras, L.-P. (2004). Fleet management system for underground mines. CIM Bulletin, 97(1077), 66-70.
- 2002 (1)
Article de revue Alarie, S., & Gamache, M. (2002). Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. International Journal of Surface Mining, Reclamation and Environment, 16(1), 59-76.
- 2000 (1)
Article de revue Li, L., Gamache, M., & Aubertin, M. (2000). Parameter Determination for Nonlinear Stress Criteria Using a Simple Regression Tool. Canadian Geotechnical Journal, 37(6), 1332-1347.
- 1999 (1)
Article de revue Gamache, M., Soumis, F., Marquis, G., & Desrosiers, J. (1999). A Column Generation Approach for Large-Scale Aircrew Rostering Problems. Operations Research, 47(2), 247-263.
- 1998 (4)
Rapport Gamache, M., Soumis, F., Marquis, G., & Desrosiers, J. (1998). A Column Generation Approach for Large Scale Rostering Problems. (Rapport technique n° G-94-20).Chapitre de livre Gamache, M., & Soumis, F. (1998). A Method for Optimally Solving the Rostering Problem. Dans International Series in Operations Research & Management Science (Vol. 9, p. 124-157).Chapitre de livre Desaulniers, G., Desrosiers, J., Gamache, M., & Soumis, F. (1998). Crew Scheduling in Air Transportation. Dans Fleet management and logistics (p. 169-185).Article de revue Gamache, M., Soumis, F., Villeneuve, D., Desrosiers, J., & Gélinas, É. (1998). Preferential Bidding System at Air Canada. Transportation Science, 32(3), 246-255.
- 1995 (1)
Thèse Gamache, M. (1995). Fabrication d'horaires mensuels pour les membres d'équipage en transport aérien [Thèse de doctorat, École Polytechnique de Montréal].
- 1993 (1)
Rapport Gamache, M., & Soumis, F. (1993). A Method for Optimally Solving the Rostering Problem. (Rapport technique n° G-93-40).