Hajlaoui, Y., Labib, R., Gamache, M., & Plante, J.-F. Enhancing Spatial Interpolation: A Multi-Layer Inverse Distance Weighting Model for Complex Regression and Classification Tasks in Spatial Data Analysis. International Journal of Mathematical and Computational Sciences, 18(10), 121-128.
Directory of Experts
Gamache, Michel
Directory of Experts
Gamache, Michel
Directory of Experts
Publications by type
Journal article (54)
Conference paper (11)
Book
Book chapter (3)
Patent
Report (51)
Thesis (1)
Dataset
Teaching resource
Image
Audio recording
Video recording
Other
Michel Gamache (120)
- Journal articles (54)
- 2025
Journal article Journal article Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2025). A digital transformation project portfolio management model for underground mines. Procedia Computer Science, 256, 1467-1473. Presented at CENTERIS, ProjMAN, HCist (2024), Funchal, Madeira island, Portugal.Journal article Hajlaoui, Y., Labib, R., Plante, J.-F., & Gamache, M. (2025). Backpropagation-based inference for spatial interpolation to estimate the blastability index in an open pit mine. Computers and Geosciences, 194, 15 pages.Journal article Maftah, M., Gamache, M., Agard, B., & Gendreau, M. (2025). Coordination of electrical drilling machines in open-pit mines: a constraint programming approach. International Journal of Mining Reclamation and Environment, 28 pages.Journal article Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2025). Implementation Approaches for Digital Transformation: Current State of the Mining Industry. Mining Metallurgy & Exploration.Journal article Simon, V., Pellerin, R., & Gamache, M. (2025). Predicting Haul Truck Travel Times in Underground Mines. Mining Metallurgy & Exploration, 21 pages.Journal article Maftah, M., Gendreau, M., Agard, B., & Gamache, M. (2025). Scheduling of Drilling Machines in Open-Pit Mines: Stochastic and Non-Probabilistic CP Approaches. Optimization and Engineering.
- 2024
Journal article Robatto Simard, S., Gamache, M., & Doyon-Poulin, P. (2024). Development and usability evaluation of VulcanH, a CMMS prototype for preventive and predictive maintenance of mobile mining equipment. Mining, 4(2), 326-351.Journal article Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2024). Opportunities for research to achieve the vision of the Smart Mine. CIM Journal, 2377527 (34 pages).Journal article Aalian, Y., Gamache, M., & Pesant, G. (2024). Short-term underground mine planning with uncertain activity durations using constraint programming. Journal of Scheduling, 17 pages.
- 2023
Journal article Robatto Simard, S., Gamache, M., & Doyon-Poulin, P. (2023). Current Practices for Preventive Maintenance and Expectations for Predictive Maintenance in East-Canadian Mines. Mining, 3(1), 26-53.Journal article Zagré, G. E., Gamache, M., Labib, R., & Shlenchak, V. (2023). Machine learning algorithms for real-time coal recognition using monitor-while-drilling data. International Journal of Mining, Reclamation and Environment, 26 pages.Journal article Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2023). Optimising the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty. International Journal of Mining, Reclamation and Environment, 37(5), 355-374.Journal article Gamache, M., Basilico, G., Frayret, J.-M., & Riopel, D. (2023). Real-time multi-agent fleet management strategy for autonomous underground mines vehicles. International Journal of Mining, Reclamation and Environment, 37(9), 649-666.Journal article Grogan, S., Gamache, M., & Pellerin, R. (2023). Using historical data to dynamically route post-disaster assessment unmanned aerial vehicles in the context of responding to tornadoes. Applied Sciences, 13(7), 4178.
- 2022
Journal article Campeau, L.-P., Gamache, M., & Martinelli, R. (2022). Integrated optimisation of short- and medium-term planning in underground mines. International Journal of Mining Reclamation and Environment, 36(4), 235-253.Journal article Grogan, S., Perrier, N., Gamache, M., & Pellerin, R. (2022). Location of disaster assessment UAVs using historical tornado data. Geomatics, Natural Hazards and Risk, 13(1), 2385-2404.Journal article Rimélé, A., Gamache, M., Gendreau, M., Grangier, P., & Rousseau, L.-M. (2022). Robotic mobile fulfillment systems: a mathematical modelling framework for e-commerce applications. International Journal of Production Research, 60(11), 3589-3605.Journal article Campeau, L.-P., & Gamache, M. (2022). Short- and medium-term optimization of underground mine planning using constraint programming. Constraints, 27(4), 414-431.
- 2021
Journal article Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Learning high-order spatial statistics at multiple scales: A kernel-based stochastic simulation algorithm and its implementation. Computers & Geosciences, 149, 11 pages.Journal article Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Training Image Free High-Order Stochastic Simulation Based on Aggregated Kernel Statistics. Mathematical Geosciences, 53(7), 1469-1489.Journal article Grogan, S., Pellerin, R., & Gamache, M. (2021). Using tornado-related weather data to route unmanned aerial vehicles to locate damage and victims. OR Spectrum, 43(4), 905-939.
- 2020
Journal article Rimélé, A., Dimitrakopoulos, R., & Gamache, M. (2020). A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resources Policy, 65, 8 pages.Journal article Campeau, L.-P., & Gamache, M. (2020). Short-term planning optimization model for underground mines. Computers & Operations Research, 115, 104642 (12 pages).Journal article Martinelli, R., Collard, J., & Gamache, M. (2020). Strategic planning of an underground mine with variable cut-off grades. Optimization and Engineering, 21(3), 803-849.
- 2019
Journal article Montagné, R., Gamache, M., & Gendreau, M. (2019). A shortest path-based algorithm for the inventory routing problem of waste vegetable oil collection. Journal of the Operational Research Society, 70(6), 986-997.Journal article Yao, L., Dimitrakopoulos, R., & Gamache, M. (2019). High-Order Sequential Simulation via Statistical Learning in Reproducing Kernel Hilbert Space. Mathematical Geosciences, 52(5), 693-723.Journal article Zagre, G. É. P., Marcotte, D., Gamache, M., & Guibault, F. (2019). New Tabu Algorithm for Positioning Mining Drillholes with Blocks Uncertainty. Natural Resources Research, 28(3), 609-629.
- 2018
Journal article Yao, L., Dimitrakopoulos, R., & Gamache, M. (2018). A new computational model of high-order stochastic simulation based on spatial Legendre moments. Mathematical Geosciences, 50(8), 929-960.Journal article Adrien Rimélé, M., Dimitrakopoulos, R., & Gamache, M. (2018). A stochastic optimization method with in-pit waste and tailings disposal for open pit life-of-mine production planning. Resources, 57, 112-121.Journal article Bai, X., Marcotte, D., Gamache, M., Gregory, D., & Lapworth, A. (2018). Automatic generation of feasible mining pushbacks for open pit strategic planning. Journal of the Southern African Institute of Mining and Metallurgy, 118(5), 515-530.
- 2016
Journal article Homaie-Shandizi, A.-H., Partovi Nia, V., Gamache, M., & Agard, B. (2016). Flight deck crew reserve: From data to forecasting. Engineering Applications of Artificial Intelligence, 50, 106-114.Journal article Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2016). Location arc routing problem with inventory constraints. Computers and Operations Research, 76, 84-94.Journal article Nelis, G., Gamache, M., Marcotte, D., & Bai, X. (2016). Stope optimization with vertical convexity constraints. Optimization and Engineering, 17(4), 813-832.Journal article Carpentier, S., Gamache, M., & Dimitrakopoulos, R. (2016). Underground long-term mine production scheduling with integrated geological risk management. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 125(2), 93-102.
- 2014
Journal article Riquelme Rodriguez, J. P., Langevin, A., & Gamache, M. (2014). Adaptive large neighborhood search for the periodic capacitated arc routing problem with inventory constraints. Networks, 64(2), 125-139.Journal article Riquelme-Rodríguez, J.-P., Gamache, M., & Langevin, A. (2014). Periodic capacitated arc-routing problem with inventory constraints. Journal of the Operational Research Society, 65(12), 1840-1852.
- 2012
Journal article Jaoua, A., Riopel, D., & Gamache, M. (2012). A simulation framework for real-time fleet management in internal transport systems. Simulation Modelling Practice and Theory, 21(1), 78-90.Journal article Dupuis, C., Gamache, M., & Page, J.-F. (2012). Logical Analysis of Data for Estimating Passenger Show Rates at Air Canada. Journal of Air Transport Management, 18(1), 78-81.Journal article Laroche, M.-A., Gamache, M., & Olivier-Ouellet, J. (2012). Optimization of Codeshares Flight Selection for an Airline Company. INFOR, 50(1), 31-39.Journal article Jaoua, A., Riopel, D., & Gamache, M. (2012). Specification of an intelligent simulation based real time control architecture : application to truck control system. Computers in Industry, 63(9), 882-894.
- 2009
Journal article Jaoua, A., Riopel, D., & Gamache, M. (2009). A framework for realistic microscopic modelling of surface mining transportation systems. International Journal of Mining, Reclamation and Environment, 23(1), 51-75.
- 2008
Journal article Bigras, L. P., Gamache, M., & Savard, G. (2008). The Time-Dependent Traveling Salesman Problem and Single Machine Scheduling Problems With Sequence Dependent Setup Times. Discrete Optimization, 5(4), 685-699.Journal article Bigras, L. P., Gamache, M., & Savard, G. (2008). Time-Indexed Formulations and the Total Weighted Tardiness Problem. INFORMS Journal on Computing, 20(1), 133-142.
- 2007
Journal article Gamache, M., Hertz, A., & Ouellet, J. O. (2007). A Graph Coloring Model for a Feasibility Problem in Monthly Crew Scheduling With Preferential Bidding. Computers & Operations Research, 34(8), 2384-2395.Journal article Achour, H., Gamache, M., Soumis, F., & Desaulniers, G. (2007). An Exact Solution Approach for the Preferential Bidding System Problem in the Airline Industry. Transportation Science, 41(3), 354-365.
- 2006
Journal article Beaulieu, M., & Gamache, M. (2006). An enumeration algorithm for solving the fleet management problem in underground mines. Computers & Operations Research, 33(6), 1606-1624.
- 2005
Journal article Gamache, M., Grimard, R., & Cohen, P. (2005). A shortest-path algorithm for solving the fleet management problem in underground mines. European Journal of Operational Research, 166(2), 497-506.Journal article Bigras, L.-P., & Gamache, M. (2005). Considering Displacement Modes in the Fleet Management Problem. International Journal of Production Research, 43(6), 1171-1184.
- 2004
Journal article Gamache, M., Cohen, P., Grimard, R., & Bigras, L.-P. (2004). Fleet management system for underground mines. CIM Bulletin, 97(1077), 66-70.
- 2002
Journal article Alarie, S., & Gamache, M. (2002). Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. International Journal of Surface Mining, Reclamation and Environment, 16(1), 59-76.
- 2000
Journal article Li, L., Gamache, M., & Aubertin, M. (2000). Parameter Determination for Nonlinear Stress Criteria Using a Simple Regression Tool. Canadian Geotechnical Journal, 37(6), 1332-1347.
- 1999
Journal article Gamache, M., Soumis, F., Marquis, G., & Desrosiers, J. (1999). A Column Generation Approach for Large-Scale Aircrew Rostering Problems. Operations Research, 47(2), 247-263.
- 1998
Journal article Gamache, M., Soumis, F., Villeneuve, D., Desrosiers, J., & Gélinas, É. (1998). Preferential Bidding System at Air Canada. Transportation Science, 32(3), 246-255.
- 2025
- Conference papers (11)
- 2023
Conference paper Aalian, Y., Pesant, G., & Gamache, M. (2023, August). Optimization of Short-Term Underground Mine Planning Using Constraint Programming [Paper]. 29th International Conference on Principles and Practice of Constraint Programming (CP 2023), Toronto, ON, Canada (16 pages).
- 2022
Conference paper Robatto Simard, S., Bouchard, A., Tang, C., Tahan, A., Doyon-Poulin, P., & Gamache, M. (2022, November). Outil d'aide à la décision en planification de maintenance [Decision support tool for maintenance planning]. [Abstract]. 43e édition Québec Mines + Énergie, Montréal, Québec, Canada.
- 2019
Conference paper Grogan, S., Gamache, M., & Pellerin, R. (2019, June). Dynamically Routing UAVs in the Aftermath of a Severe Tornado [Paper]. PROLOG 2019, Metz, France.
- 2018
Conference paper Grogan, S., Gamache, M., & Pellerin, R. (2018, June). The use of unmanned aerial vehicles and drones in search and rescue operations - a survey [Paper]. PROLOG 2018, Hull, UK.
- 2017
Conference paper Saoudi, M., Riopel, D., & Gamache, M. (2017, May). Les indicateurs de performance des systèmes de préparation de commande : revue de littérature [Paper]. 12e congrès international de génie industriel (CIGI 2017), Compiègne, France (9 pages).
- 2015
Conference paper David, A., Gamache, M., & Riopel, D. (2015, October). Localisation optimale de produits au centre de distribution de Thomas & Betts de Bromont, Canada [Paper]. 11e Congrès international de génie industriel, Québec, Canada (7 pages).
- 2013
Conference paper Damala, Y., Lacerte, K., Gamache, M., & Riopel, D. (2013, June). Impacts de nouveaux processus sur les opérations d'Air Canada Cargo [Paper]. 10e congrès international de génie industriel, La Rochelle, France (8 pages).
- 2012
Conference paper Damala, Y., Gamache, M., Riopel, D., & Lecerte, K. (2012, May). Modélisation de la logistique d'un entrepôt pour Air Canada Cargo [Paper]. 2e Journées de l'Optimisation, Montréal, Québec.
- 2010
Conference paper Jaoua, A., Riopel, D., & Gamache, M. (2010, May). Adaptation de la commande prédictive aux systèmes à événements discrets : application pour l'optimisation en temps réel du processus de transport minier [Paper]. 8e Conférence Internationale de MOdélisation et SIMulation (MOSIM 2010), Hammamet, Tunisie (9 pages).
- 2009
Conference paper Gamache, M., Hébert-Desgroseilliers, L., & Desaulniers, G. (2009, November). A generic linear program for an optimal mine production plan [Paper]. Mine Planning and Equipment Select & Environmental Issues and Waste Management in Energy and Mineral Product, Banff, Canada.
- 2003
Conference paper Gamache, M., Beaulieu, M., & Cohen, P. (2003, November). Solving the Fleet Management Problem in Underground Mines by Dynamic Programming [Paper]. Computer Applications in the Mineral Industries (CAMI 2003) (23 pages).
- 2023
- Book chapters (3)
- 2020
Book chapter Gamache, M., & Auger, G. (2020). Analysis of maximum flow algorithms for ultimate pit contour problems. In Xie, H. (ed.), Computer Applications in the Mineral Industries (pp. 267-272).
- 1998
Book chapter Gamache, M., & Soumis, F. (1998). A Method for Optimally Solving the Rostering Problem. In International Series in Operations Research & Management Science (Vol. 9, pp. 124-157).Book chapter Desaulniers, G., Desrosiers, J., Gamache, M., & Soumis, F. (1998). Crew Scheduling in Air Transportation. In Fleet management and logistics (pp. 169-185).
- 2020
- Reports (51)
- 2024
Report Echternach-Jaubert, M., Pellerin, R., & Gamache, M. (2024). A digital transformation project portfolio management model for underground mines. (Technical Report n° G-2024-75).Report Maftah, M., Gamache, M., Agard, B., & Gendreau, M. (2024). Coordination of electrical drilling machines in open-pit mines : a constraint programming approach. (Technical Report n° G-2024-62).Report Maftah, M., Agard, B., Gendreau, M., & Gamache, M. (2024). Integrated dispatching and coordination of electrical drill rigs in open-pit mines: A constraint programming approach. (Technical Report n° G-2024-74).Report Maftah, M., Gendreau, M., Agard, B., & Gamache, M. (2024). Scheduling of drilling machines in open-pit mines: Stochastic and non-probabilistic CP approaches. (Technical Report n° G-2024-71).
- 2022
Report Aalian, Y., Gamache, M., & Pesant, G. (2022). Short-term underground mine planning with uncertain activity durations using constraint programming. (Technical Report n° G-2022-44).
- 2021
Report Rimelé, A., Grangier, P., Gamache, M., Gendreau, M., & Rousseau, L.-M. (2021). E-commerce warehousing : learning a storage policy. (Technical Report n° CIRRELT-2021-03).Report Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2021). Optimizing the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty. (Technical Report n° G-2021-17).Report Yao, L., Dimitrakopoulos, R., & Gamache, M. (2021). Training image free high-order stochastic simulation based on aggregated kernel statistics. (Technical Report n° G-2021-14).
- 2020
Report Bigeon, E., Gagnon, M., Alarie, S., Tahan, A., & Gamache, M. (2020). Long-term influence of priority order of short-term unit commitment in a complex hydroelectric system. (Technical Report n° G-2020-26).Report Rimelé, A., Gamache, M., Gendreau, M., Grangier, P., & Rousseau, L.-M. (2020). Robotic mobile fulfillment systems : a mathematical modelling framework for e-commerce applications. (Technical Report n° CIRRELT 2020-42).
- 2019
Report Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2019). Solving the mixed-integer linear programming problem for mine production scheduling with stockpiling under multi-element geological uncertainty. (Technical Report n° G-2019-05).
- 2018
Report Rimélé, A., Dimitrakopoulos, R., & Gamache, M. (2018). A dynamic stochastic approach for open-pit mine planning. (Technical Report n° G-2018-87).Report Yao, L., Dimitrakopoulos, R., & Gamache, M. (2018). A new computational model of high-order stochastic simulation based on spatial Legendre moments. (Technical Report n° G-2018-89).Report Campeau, L.-P., Gamache, M., & Martinelli, R. (2018). Integreted optimization of short- and medium-term planning in underground mine. (Technical Report n° G-2018-55).Report Brika, Z., Gamache, M., & Dimitrakopoulos, R. (2018). Multi-product mine scheduling optimization under multi-element geological uncertainty. (Technical Report n° G-2018-72).Report Campeau, L.-P., & Gamache, M. (2018). Short- and medium-term optimization of underground mine planning using constraints programming. (Technical Report n° G-2018-94).
- 2017
Report Rimélé, A., Gamache, M., & Dimitrakopoulos, R. (2017). Heuristic method for the stochastic open pit mine production scheduling problem. (Technical Report n° G-2017-34).Report Rimélé, A., Gamache, M., & Dimitrakopoulos, R. (2017). Open pit stochastic optimization with in-pit tailings storage. (Technical Report n° G-2017-35).Report Azeuli Nkamegni, K., Gamache, M., Hertz, A., & Paroz, S. (2017). Optimizing keyword positions for search engine marketing. (Technical Report n° G-2017-26).
- 2016
Report Campeau, L.-P., & Gamache, M. (2016). Short-term planning optimization model for underground mines. (Technical Report n° G-2016-26).
- 2015
Report Piveteau, A., Gamache, M., & Pellerin, R. (2015). An iterative algorithm based on evolutive cuts for project scheduling with material storage constraints. (Technical Report n° G-2015-106).Report Gamache, M. (2015). A structured approach to model logical constraints. (Technical Report n° G-2015-48).Report Homaie-Shandizi, A.-H., Partovi Nia, V., Gamache, M., & Agard, B. (2015). Flight deck crew absenteeism: From data to forecasting. (Technical Report n° G-2015-108).Report Nelis, G., Gamache, M., Marcotte, D., & Bai, X. (2015). Stope optimization with convexity constraints. (Technical Report n° G-2015-47).Report Carpentier, S., Gamache, M., & Dimitrakopoulos, R. (2015). Underground long-term mine production scheduling with integrated geological risk management. (Technical Report n° G-2015-107).
- 2014
Report Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2014). Adaptive large neighborhood search for the periodic capacitated arc routing problem with inventory constraints. (Technical Report n° G-2014-01).Report Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2014). Location of water depots in open-pit mine networks. (Technical Report n° G-2014-12).
- 2013
Report Collard, J., Martinelli, R., & Gamache, M. (2013). Strategic Planning of an Underground Mine with Variable Cut-off Grades. (Technical Report n° G-2013-86).
- 2012
Report Riquelme Rodriguez, J. P., Gamache, M., & Langevin, A. (2012). Periodic Capacitated Arc Routing Problem with Inventory Constraints. (Technical Report n° G-2012-73).
- 2009
Report Jaoua, A., Riopel, D., & Gamache, M. (2009). Adaptation de la commande prédictive aux systèmes à événements discrets: application pour l'optimisation en temps réel du processus de transport minier. (Technical Report n° G-2009-82).Report Gamache, M., Hébert-Desgroseilliers, L., & Desaulniers, G. (2009). A Generic Linear Program for an Optimal Mine Production Plan. (Technical Report n° G-2009-83).Report Jaoua, A., Riopel, D., & Gamache, M. (2009). Efficient simulation model for real-time fleet management problems in international transport systems. (Technical Report n° G-2009-33).Report Jaoua, A., Riopel, D., & Gamache, M. (2009). Specification of an intelligent simulation based real time control architecture : Application to truck control system. (Technical Report n° G-2009-32).
- 2007
Report Jaoua, A., Gamache, M., & Riopel, D. (2007). Comparaison d'approches de modélisation de problèmes tests pour le pilotage du transport : application aux mines à ciel ouvert. (Technical Report n° G-2007-102).
- 2006
Report Bigras, L.-P., Gamache, M., & Savard, G. (2006). The Time-Dependent Traveling Salesman Problem and Single Machine Scheduling Problems with Sequence Dependent Setup Time. (Technical Report n° G-2006-15).
- 2005
Report Gamache, M., Hertz, A., & Ouellet, J. O. (2005). A Graph Coloring Model for a Feasibility Problem in Crew Scheduling. (Technical Report n° G-2005-34).Report Bigras, L.-P., Gamache, M., & Savard, G. (2005). Time-Indexed Formulations and the Total Weighted Tardiness Problem. (Technical Report n° G-2005-30).
- 2004
Report Beaulieu, M., & Gamache, M. (2004). An Enumeration Algorithm for Solving the Fleet Management Problem in Underground Mines. (Technical Report n° G-2004-52).Report Achour, H., Gamache, M., Soumis, F., & Desaulniers, G. (2004). An Exact Solution Approach for the PBS Problem. (Technical Report n° G-2004-89).
- 2003
Report Achour, H., Gamache, M., & Soumis, F. (2003). Branch and Cut at the Subproblem Level in a Column Generation Approach: Application to the Airline Industry. (Technical Report n° G-2003-34).Report Gamache, M., & Bigras, L.-P. (2003). Considering Displacement Modes in the Fleet Management Problem. (Technical Report n° G-2003-82).Report Gamache, M., Beaulieu, M., & Cohen, P. (2003). Solving the Fleet Management Problem in Underground Mines by Dynamic Programming. (Technical Report n° G-2003-83).
- 2002
Report Bigras, L.-P., Gamache, M., & Cohen, P. (2002). A Solution Approach for a Real-Time Fleet Management System: An Application to Underground Mining. (Technical Report n° G-2002-66).Report Gamache, M., Cohen, P., & Grimard, R. (2002). Fleet Management System for Underground Mines. (Technical Report n° G-2002-68).
- 2001
Report Alarie, S., & Gamache, M. (2001). Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. (Technical Report n° G-2001-38).
- 2000
Report Gamache, M., & Auger, G. (2000). Analysis of Maximum Flow Algorithms for Ultimate Pit Contour Problems. (Technical Report n° G-2000-57).
- 1998
Report Gamache, M., Soumis, F., Marquis, G., & Desrosiers, J. (1998). A Column Generation Approach for Large Scale Rostering Problems. (Technical Report n° G-94-20).Report Gamache, M., Soumis, F., Villeneuve, D., Desrosiers, J., & Gélinas, E. (1998). Le système d'horaires mensuels personnalisés d'Air Canada. (Technical Report n° G-98-56).
- 1997
Report Desaulniers, G., Desrosiers, J., Gamache, M., & Soumis, F. (1997). Crew Scheduling in Air Transportation. (Technical Report n° G-97-26).Report Gamache, M., Soumis, F., Villeneuve, D., Desrosiers, J., & Gélinas, E. (1997). The Preferential Bidding System at Air Canada. (Technical Report n° G-97-12).
- 1993
Report Gamache, M., & Soumis, F. (1993). A Method for Optimally Solving the Rostering Problem. (Technical Report n° G-93-40).
- 2024
- Theses (1)
- 1995
Thesis Gamache, M. (1995). Fabrication d'horaires mensuels pour les membres d'équipage en transport aérien [Ph.D. thesis, École Polytechnique de Montréal].
- 1995